Description
A complex project with a lot of preparation, waterproofing and temporary support to install a 70,000 lbs tank on drilled piles in the middle of a factory with an “unconventional” structure and very little space to maneuver. This project was carried out in accelerated mode.
Type of service: Industrial
Date: N/A
Location: Baie-d’Urfé
Client: Styrochem